The objectives of this project were to investigate the impact on the calculated failure rates as a
result of changes to the data within PIPIN. These changes were required to ensure that the input
data was representative of UK pipelines by ensuring that all of the latest available information
was being used.
↧
RR1038 – Data updates to HSE’s PIPeline INtegrity model (PIPIN)
↧